A secondary suite can add rental income, room for family or a more flexible use of a Kelowna house. It can also be one of the easiest home projects to get wrong, because the rules combine zoning, building code, fire separation, parking, servicing and inspection. The City of Kelowna's current suite bulletin is the place to start, not a general contractor's summary or an old forum post. This guide walks through what the City requires, what happens before and during construction, and the questions that separate a prepared homeowner from an expensive correction later.
What counts as a secondary suite in Kelowna
Kelowna's April 2026 suite bulletin defines a secondary suite as a self-contained unit that has been issued an Occupancy Permit, is located within a dwelling and has a maximum total floor area of 90 m², or 968 square feet. The City's public suite page adds the practical detail: the suite has its own entrance, kitchen, bathroom and living area, is interconnected to the primary dwelling and is restricted in size based on the principal dwelling.
The building type matters. The zoning bylaw allows a secondary suite within a single detached dwelling, a semi-detached unit, a duplex unit or a townhouse unit. It does not allow suites in apartment housing, boarding or lodging houses, and the bylaw says bed and breakfast homes, boarding or lodging homes and group homes cannot operate within a secondary suite. A suite also has to be in a building of residential occupancy and in a single real estate entity.
A suite is not the same as a carriage house, a garden suite or a separate detached dwelling. Those are different approvals with different zoning rules. If the plan is to add a separate building rather than convert space inside an existing dwelling, ask the City which application applies before assuming the secondary suite bulletin covers it.
Zoning and where suites are allowed
The City's suite page tells owners to confirm zoning first, then apply for a secondary suite permit. That order matters. A property can have a house that looks suitable and still fail a zoning requirement, such as the wrong building type, a lot that is not serviced with community water, or a site that cannot fit the required parking and path. The zoning bylaw also requires the suite to be separated from other parts of the building by fire separations and to have an issued Occupancy Permit.
The City's checklist asks for a site plan showing the suite parking spot, the path to the suite entrance and the required lighting, along with floor plans, cross-sections and elevations. Those drawings are not paperwork for its own sake. They force the owner and designer to prove that the suite fits the lot, the building and the code before construction starts. If the property is in a strata, the checklist also asks for strata approval where applicable, and the owner is responsible for confirming the strata bylaws allow the work.
The City's suite line is 250-469-8960 for questions about zoning and the application. A short call before buying drawings is cheaper than discovering a site constraint after a designer has been paid.
Permits and inspections before work starts
A building permit is required to create a secondary suite. The City says all secondary suites must be registered, and registration confirms that the suite complies with the BC Building Code and the zoning bylaw. A building inspector must inspect the premises and grant occupancy before the suite is occupied. That sequence is the backbone of the project: zoning check, permit application, construction, inspections, occupancy.
| Requirement | What to confirm | Who confirms it |
|---|---|---|
| Building permit | A permit is required before creating a suite | City of Kelowna Building & Permitting |
| Registration and occupancy | The suite is registered and inspected before occupancy | City building inspector |
| Zoning and building type | The suite is allowed in this dwelling and on this lot | City zoning review |
| Fire separation | Walls and floors meet the current BC Building Code assembly | Permit drawings and City inspections |
| Smoke and CO alarms | Hard-wired and interconnected in dwelling and common spaces | Electrical work and final inspection |
| Heating, cooling and ventilation | Suite controls its own heat, has permanent cooling in at least one room and meets ventilation rules | Mechanical design and City inspection |
| Parking and pathway | Dedicated off-street stall and a lit hard-surfaced path at least 860 mm wide | Site plan and zoning review |
| Sewer and water servicing | Community water service; sewer fee if connected to City sewer | City and utility providers |
The application is not only a building permit. Electrical and gas work are separately regulated in British Columbia, and the contractor performing that work is generally responsible for the permit. Ask each trade which permit they are pulling and who will request the inspection. A building permit does not make unpermitted electrical work acceptable.
Building code and fire separation basics
The City says the current BC Building Code applies to ceiling height, egress, ventilation and fire separations. The 2024 BC Building Code came into effect on March 8, 2024 for projects with building permits applied for after that date, and it adopted a cooling requirement for one living space that does not exceed 26°C. For a suite, that provincial rule lines up with the City's own requirement for a permanent cooling method in at least one room.
Fire separation is where cheap shortcuts show up first. The City bulletin shows recommended suite separation assemblies at 30 minutes and 45 minutes. The 30-minute assembly requires an additional interconnected photoelectric smoke alarm in each unit. The 45-minute assembly does not require that additional interconnection to the main dwelling, but the alarms still have to be interconnected within the suite. The bulletin also says ducts serving the primary dwelling cannot open into the suite, and shared-furnace designs need separate thermostats, zone control dampers and fire dampers at fire separations.
- Smoke alarms must be hard-wired for power and interconnected for all dwelling and common spaces.
- Carbon monoxide alarms are required where the building has a fuel-burning appliance or an attached garage, and must be hard-wired and interconnected.
- Suite heating must be locally controlled, so the tenant can adjust their own heat.
- At least one room in the suite needs a permanent means of cooling; passive design is not accepted.
- Every bedroom needs an outside window or exterior door that opens from the inside, with the egress opening described in the City bulletin.
- Shared ductwork is restricted: ducts can only open into one fire compartment, and shared-furnace designs need the listed fire and zone controls.
Parking, servicing and city fees
The City requires off-street parking for the suite that conforms to Zoning Bylaw No. 12375, designated for the suite's use and a minimum of one dedicated stall. A lit pathway with a hard surface must run from the parking stall to the suite entrance, with a minimum width of 860 mm, or 34.4 inches. The suite address must be prominently displayed at the front of the premises so it is clear where access occurs.
Servicing catches some owners by surprise. A suite must be on a lot serviced with community water, and a $300 sewer development fee may apply where the primary dwelling is connected to City sewer. The City also says it is the owner's responsibility to contact the local water district and Fortis BC before construction to find out whether additional utility costs apply. Those calls belong in the feasibility stage, not after the framing is up.
The City's own bulletin is careful about permit fees: the $300 sewer development fee is the number it states, and it says the fee will be collected with building permit fees. Other permit charges depend on the application and construction value, so ask Building & Permitting for the current fee schedule rather than relying on an old blog post. Budget for drawings, engineering, permits, inspections and utility work as separate lines.
What to ask a contractor before signing
A suite is a small building inside a building, and the contractor needs experience with the parts that inspectors look at: fire separations, ductwork, alarms, egress and ventilation. The lowest quote can be the most expensive if it assumes an assembly the City will not accept or leaves the permit to the homeowner without saying so.
- Who applies for the building permit, and who pays the application and inspection fees?
- Which fire separation assembly will be built, and what smoke alarm interconnection does it require?
- How will the suite's heating, cooling and ventilation be separated from the main dwelling?
- Will any ductwork cross a fire separation, and if so, where are the fire dampers and zone controls?
- How will the bedroom egress windows meet the current BC Building Code?
- Which electrical and gas permits are required, and which licensed trade will pull each one?
- How will the parking stall and the 860 mm path be built, lit and shown on the site plan?
- What is the inspection schedule, and who is responsible for being on site for each inspection?
- If the property is strata, what written approval is needed before the permit is issued?
- What happens if the City requires a change during review or inspection, and how is that priced?
Get the answers in the written contract, not only in conversation. The City's checklist already names the drawings and approvals it expects, so a contractor who has completed Kelowna suite permits should recognise the list immediately.
Where to start in Kelowna
Start with the City's suite page and the April 2026 bulletin, then confirm zoning and servicing for the specific address. If the project is feasible, hire a designer or general contractor who can show suite permits and fire-separation work in Kelowna, and bring in electricians and plumbers for the regulated work.
The guide to choosing a general contractor explains how to compare them, and when you need a building permit in Kelowna covers the permit question more broadly. The Kelowna city hub is the place to compare other trades, from HVAC contractors to home inspectors.
Sources
- Bulletin: Secondary Suite
City of Kelowna · Published April 14, 2026 · Kelowna, BC; current suite requirements
Accessed November 16, 2026
- Secondary suite requirements
City of Kelowna · Kelowna, BC; registration and occupancy
Accessed November 16, 2026
- Zoning Bylaw No. 12375
City of Kelowna · Kelowna, BC; secondary suite zoning
Accessed November 16, 2026
- Checklist: Building Permit, Secondary Suite
City of Kelowna · Published August 1, 2022 · Kelowna, BC; application documents
Accessed November 16, 2026
- BC Building Code 2024
Province of British Columbia · Published March 10, 2025 · British Columbia; building code edition and cooling requirement
Accessed November 16, 2026
Common questions
Does every secondary suite in Kelowna need a building permit?
How large can a secondary suite be in Kelowna?
Can a secondary suite share a furnace with the main house?
What parking does a Kelowna secondary suite need?

Written by
Jonathan Larose-Sabourin
Founder, Loonglade Web Studio · Kelowna, British Columbia
Jonathan Larose-Sabourin is the founder of Loonglade Web Studio, the Kelowna-based studio that operates this trades registry. He writes about local home-services rules, costs and maintenance for Kelowna homeowners.
Share this story
Related stories

Permits & Rules
Fence Height Rules in Kelowna: What the Bylaw Says
The bylaw numbers, the lot-type exceptions and the steps that keep a new fence out of a bylaw complaint.
November 21, 2026 · 8 min read

Permits & Rules
Strata Repairs in Kelowna: Who Fixes What
The useful answer is not “the strata” or “the owner.” It is the strata plan, the bylaws and the Act, in that order.
November 16, 2026 · 11 min read

Home Maintenance
Attic Condensation in Kelowna Winters: Causes and Fixes
A cheap two-visit inspection that separates air-leak condensation from roof-leak water, then fixes air sealing, ventilation and insulation in order.
November 21, 2026 · 8 min read
Find general contractors & renovations in Kelowna
Compare local listings on the General Contractors & Renovations in Kelowna page.
Before you call, read the How to Check a BC Contractor's Licence and Insurance.
Save the pros you trust.